摘要 土钉墙支护结构在目前具有很强的现实意义,由于工程设计人员对土钉受力机理的不同理解,从而选择不同的设计规范,得出不同的计算结果.本文以包头某深基坑工程为实例,使用建筑工程现行的3种规范对上部土钉墙支护结构的土钉轴力计算,对比分析这3种规范法计算结果的差异性,并讨论产生差异性的原因,为以后本地区类似工程提供一些计算参考. Soil nailing wall supporting structures have very strong practical significance at the present time. The different understanding of the soil nail force mechanism by the engineering designers results in the choice of different design codes, and then different results are obtained. A description of the foundation pit engineering presents in Baotou was presented. The soil nail axial force of the upper supporting structure were calculated by using the three kinds of existing construction codes. The differences among these three codes were compared ,the results were analyzed and the causes of the differences were discussed. Some references were provided for future similar projects in Baotou.
出处 《内蒙古科技大学学报》 CAS 2015年第1期91-95,共5页 Journal of Inner Mongolia University of Science and Technology
关键词 规范法 土钉轴力 对比分析 code method soil nail axial force contrastive analysis
  • 相关文献

参考文献4

  • 1JGJ120-2012,建筑基坑支护技术规程[S].
  • 2GB50739-2011复合土钉墙基坑支护技术规范[S],2011.
  • 3CECS96:97.基坑土钉支护技术规程[S].[S].,..
  • 4JGJ120-99.建筑基坑支护技术规程[S].[S].,..

共引文献1133

同被引文献28

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部