摘要
电力需求预测应当适应国民经济和社会发展的需要,适应不同阶段城乡居民生活用电的要求。电力需求预测是电源规划、电网规划的基础。根据我国电力需求发展情况,调整国民经济发展速度,对220k V变电站设置35k V电压等级恻十分有必要。本文针对国家电局电力实际情况,对这一决策的必要性浅作探讨研究。
Electric power demand forecasting should adapt to the needs of national economic and social development and meet the living power needs of urban and rural residents at different stages.Electric power demand forecasting is the foundation of power source planning and power grid planning.According to the development of China's electric power demand,the adjustment of national economic development speed is extremely essential for the set of 35 kv voltage level in220 kv substation.According to the actual situation of electric power of National Electricity Bureau,this paper explored and studied the necessity of this decision.
出处
《河南科技》
2015年第2期134-135,共2页
Henan Science and Technology