期刊文献+

DBB模式下施工总承包合同双方信任状态描述—基于内容分析的访谈研究 被引量:1

Describing trust state of construction general contracting parties under DBB mode based upon study of interview and content analysis method
原文传递
导出
摘要 已有研究表明,工程中的信任是项目成功的重要因素,因此描述工程项目中合同双方的信任状态是项目实施中的重要环节。在DBB模式下,以文献研究为基础,总结出表征工程信任的关键事件;以基于内容分析的访谈为工具,识别出可测量信任状态的抓手,明确了合同双方的信任状态表现。据此,以项目全过程为视角,构建了合同双方信任状态的动态提升模型。研究表明,利用信任状态抓手对合同双方的信任状态进行客观测量,有利于双方明确了解对方的信任水平,并对己方采用的各种改善信任状态的措施效果进行判断,以提升项目成功的概率。 Previous studies suggest that trust is a key factor in success of construction projects, and how to describe the trust state between the owner and contractor of a construction project is a very important part of project implementation. This paper summarizes the previously reported key events that represent trust in the DBB mode, and recognizes grips that can measure trust state using the data of interviews and a content analysis method, focusing on clarification of the contract parties' behaviors of trust state. Based on this, we develop a dynamic elevation model of owner-contractor trust state for the overall process of a construction project. The results have shown that the trust grips, as a measure of trust state, can help contacting parties understand better the partner's trust level and judge the effectiveness of various measures for improving the trust state, thus promoting the probability of project success.
出处 《水力发电学报》 EI CSCD 北大核心 2015年第4期177-183,共7页 Journal of Hydroelectric Engineering
基金 国家自然科学基金青年项目(71002066) 国家自然科学基金项目(71372110)
关键词 工程管理 信任状态 半结构访谈 内容分析法 信任抓手 project management trust state semi-structured interview content analysis method trust grips
  • 相关文献

参考文献16

  • 1乐云,蒋卫平.建设工程项目中信任产生机制研究[J].工程管理学报,2010,24(3):313-317. 被引量:19
  • 2蒋卫平,张谦,乐云,何清华.工程项目中信任的产生与影响——基于承包商方视角[J].西安建筑科技大学学报(自然科学版),2012,44(1):97-102. 被引量:7
  • 3Rosalinde Klein Woolthuis, Bas Hillebrand, Bart Nooteboom. Trust, Contract and Relationship Development [J].Organization Studies,2005,26(6): 813-840.
  • 4Doloi Hemanta. Empirical Analysis of Traditional Contracting and Relationship Agreements for Procuring Partners inConstruction?Proj ects [J]. Journal of Management in Engineering,2013, 29(3): 224-235.
  • 5Girmscheid G,Brockmann C.Inter-and Intra-Organizational Trust in International Construction Joint VenturesfJ]. Journal ofConstruction Engineering and Management, 2010? 136(3): 353-360.
  • 6Jeffrey K. Pinto, Dennis P. Slevin,Brent English. Trust in Projects: An empirical Assessment of Owner /ContractorRelationships [J]. International Journal of Project Management, 2009, 27(6): 638-648.
  • 7Zhikun Ding, Fungfai Ng. Reliability and Validity of the Chinese Version of McAllister's Trust Scale[J]. ConstructionManagement and Economics,2007,25(11): 1107-1117.
  • 8Sai On Cheung, Wei Kei Wong, Tak Wing Yiu,et al. Developing a Trust Inventory for Construction Contracting[J].International Journal of Project Management, 2010,2(2): 184-196.
  • 9Greenberg P S,Greenberg R H,Antonucci Y L. Creating and Sustaining Trust in Virtual Teams[J]. Business Horizons, 2007,50(4): 325-333.
  • 10陈叶烽,叶航,汪丁丁.信任水平的测度及其对合作的影响--来自一组实验微观数据的证据[J].管理世界,2010,26(4):54-64. 被引量:59

二级参考文献52

共引文献242

同被引文献6

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部