胜利东二号露天煤矿3^#半连续系统破碎设备选型 被引量:1

3^# semi-continuous system crushing equipment selection in Shengli East No.2 Open-pit Coal Mine
下载PDF
导出
摘要 由于受采场南帮整体滑坡的影响,胜利东二号露天矿半连续系统,需重新进行优化设计。针对9 000 t/h半移动破碎站和9 000 t/h自移式破碎机,对2种破碎设备提出了3个组合方案,并对其作业空间、生产能力、生产成本、安装工期进行了综合分析,为系统重新布置时,破碎设备的选型提供依据参考。 Because of the whole south slope landslide effect in the mining field, the semi-continuous system needs to be re-designed in Shengli East No.2 Open-pit Coal Mine. Aiming at 9 000 t/h semi-moving crusher station and 9 000 t/h self-moving crusher, the article presents 3 combination schemes, and analyzes the work space, production capacity, production cost, installation period, which provides reference for crushing equipment selection when the system is rearranged.
出处 《露天采矿技术》 CAS 2015年第4期24-28,共5页 Opencast Mining Technology
关键词 半连续 破碎设备 生产能力 生产成本 semi-continuous crushing equipment production capacity production cost
  • 相关文献

参考文献4

二级参考文献2

  • 1张达贤,露天采矿新工艺,1992年,42页
  • 2刘勇,国外金属矿山,1993年,10期,11页

共引文献35

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部