摘要 盖挖车站依据土建结构浇注顺序的不同,通常可以采用盖挖顺筑法、半逆筑法和逆筑法3种施工方法。北京地铁某车站3号基坑由于管线改移及交通疏解等原因采用盖挖逆筑法施工,文章对盖挖逆筑法施工进行了系统阐述和总结,包括盖挖逆筑法施工流程、基坑围护结构施工、主体结构施工、地表沉降监测、施工质量控制等。 Pouring sequence for cover excavation of station civil structure is different, so 3 kinds of construction methods usually can be used, namely the cover and cut-bottom up, semi cover and cut-top down and cover and cut-top down. Due to pipeline change and relocation and traffic organization and other reasons in a Beijing metro station, the cover and cut-top down for the pit No.3 is used. This paper made systematic description and summary of the cover excavation reverse construction method, including the cover and cut-top down construction process, construction of foundation pit retaining structure, main structure construction, surface subsidence monitoring, and construction quality control etc.
作者 王永刚
出处 《现代城市轨道交通》 2015年第2期42-45,共4页 Modern Urban Transit
关键词 地铁车站 盖挖逆筑法 施工技术 metro station cover and cut-top down construction technology
  • 相关文献

参考文献5

  • 1施仲街,张弥,王新杰,等.地下铁道设计与施工[M].陕西西安:陕西科学技术出版社,2002.
  • 2GB50299-1999地下铁道工程施工及验收规范[S].1999.
  • 3GB50330-2002.建筑边坡工程技术规范[S].[S].北京:中国建筑工业出版社,2002..
  • 4王元湘,聂毓鑫.盖挖逆作地铁车站的结构设计[J].隧道及地下工程,1994,15(2):27-35. 被引量:2
  • 5谢世华.天安门车站采用盖挖逆作法施工[J].北京地铁建设,1994(1).

共引文献95

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部