核电厂营运单位应急响应能力评估方法研究 被引量:4

Study on Methodology for Evaluating the Capability of Nuclear Power Plants for Emergency Response
下载PDF
导出
摘要 结合核电厂营运单位的应急准备工作和核安全监管部门的监管机制与日常监督检查工作,同时充分考虑应急响应能力的构成要素及其特点,建立了一套核电厂营运单位应急响应能力评估方法。该评估方法包括定量化的性能指标的评价体系和定性的检查发现的评价体系,以及两体系在显著度确定程序的辅助下形成综合评价结果。评估方法可协助发现核电厂营运单位在应急响应能力方面存在的问题,合理分配职责及监管资源,指导和规划营运单位和监管部门的响应行动。 A methodology for evaluating the capability of nuclear power plant for emergency response is proposed. It is based on the regular emergency preparedness of nuclear power plant,the routine regulation activity and oversight process of nuclear safety authority and the key planning elements and their characteristics of capability for emergency response. The methodology includes performance indictor for quantitative evaluation,inspection finding for qualitative evaluation and the overall evaluation with the help from significance determination process. The methodology is expected to help to disclose the witness or problems in emergency response capability,help to assign responsibility and resources appropriately and help the licensee and the authority to arrange response action matrix adequately.
出处 《科学技术与工程》 北大核心 2015年第8期187-193,198,共8页 Science Technology and Engineering
基金 国家能源应用技术研究及工程示范项目(NY20120202)资助
关键词 核应急 应急准备与响应 应急响应能力评估 反应堆监管程序 核电厂 nuclear emergency emergency preparedness and response evaluation on capability for emergency response reactor oversight process
  • 相关文献

参考文献31

  • 1IAEA. Report of the japanese government to the IAEA ministerial con-ference on nuclear safety-the accident at TEPCO ’ s fukushima nuclearpower stations. Nuclear Emergency Response Headquarters, Govern-ment of Japan, 2011.
  • 2IAEA. IAEA Expert Mission. IAEA International Fact Finding ExpertMission of the Nuclear Accident Following the Great East JapanEarthquake and Tsunami, http://www.iaea.org/newscenter/news/tsunamiupdateO 1. html. 2011-6.
  • 3薛大知,张立国.福岛核事故应急引发的思考.21世纪初辐射防护论坛第九次会议,2011 ;9,26-28.
  • 4清华大学.核电厂营运单位应急响应能力评估方法,2014(内部报告).
  • 5清华大学.核电厂应急响应能力评估方法研究进展报告.第I部分:美国核电厂应急响应能力评估方法研究进展报告,2013(内部报告).
  • 6James L W. A report to the united states senate committee on appro-priations :state capability assessment for readiness. Federal Emergen-cy Management Agency, 1997.
  • 7Witt J L, Mayer F L. State capability assessment for readiness. Fed-eral Emergency Management Agency & National Emergency Manage-ment Association,2000.
  • 8IAEA. Preparedness and response for a nuclear or radiological emer-gency. IAEA Safety Standard Series No. GS-R-2,InternationalAtomic Energy Agency, Vienna,2002.
  • 9IAEA. Preparation,conduct and evaluation of exercises to test pre-paredness for a nuclear or radiological emergency. International Atom-ic Energy Agency, Vienna, 2005.
  • 10Podolak E M, Sander M E, Wingert W L, ef al. Criteria for prepara-tion and evaluation of radiological emergency response plans and pre-paredness in support of nuclear power plants,US NRC/FEMA,NUREG 0654/FEMA-REP-1 ,1980.