摘要
根据某大桥主桥2#墩承台实际施工情况,以温度监控工作为主题展开讨论,从配合比设计、施工温度控制及温度监控几个方面,简要描述整个施工质量控制过程。
According to the actual construction situation of main bridge 2 # pier cap of certain bridge, discussion has been done with the theme of temperature monitoring work. The entire construction quality control process has been briefly described in aspects of mix design, construction temperature control and temperature monitoring.
出处
《北方交通》
2015年第3期39-42,共4页
Northern Communications
关键词
桥梁
大体积承台
海工混凝土
温度控制
Bridge
Large volume pier cap
Marine concrete
Temperature control