诚南煤业15^#煤层综采设备配套方案优化设计

Optimization Design of Fully Mechanized Coal Mining Equipment for NO.15 Coal Sean in Chengnan Coal Mine
下载PDF
导出
摘要 根据15#煤层地质条件,以及15#煤层的赋存状况和井田开拓特征,结合矿井设计规模以及晋城地区开采15#煤层的经验,选择合适的采煤机、液压支架、刮板输送机、转载机、破碎机等设备。满足45万t/a的设计生产能力,设计工作面长度为120 m(巷道中心距)。提高设备利用率,实现了安全、高效生产。 According to the No.15^# coal seam geological conditions, as well as the occurrence condition and No.15^# coal seam development characteristics, combined with the scale of mine design and experience of mining of No.15^# coal seam in Jincheng area, we have selected the appropriate shearer, hydraulic support, scraper conveyor, conveyor, crusher equipment. Meeting the design production capacity of 450 000 t/a, length of working face is 120 m (tunnel center distance). Improve the utilization rate of equipment, realize safe, efficient production.
作者 刘奇先 赵钰
出处 《煤矿机械》 2015年第3期185-188,共4页 Coal Mine Machinery
关键词 综采设备 方案优化 煤层开采 fully mechanized coal mining equipment scheme optimization coal mining
  • 相关文献

参考文献5

二级参考文献16

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部