期刊文献+

晋华宫煤矿半煤岩巷支护参数优化分析 被引量:1

Optimization analysis on support parameter in half-coal and half-rock roadway of Jinhuagong coal mine
下载PDF
导出
摘要 以晋华宫煤矿为例,对该煤矿8号煤层工作面皮轨合一巷支护参数优化进行了研究,运用FLAC3D建立皮轨合一巷的数值模型,结合原支护方案进行数值分析,可知巷道顶板围岩较为稳定,且锚杆轴向受力远小于其极限荷载,并依据模拟结果和现场经验,设计皮轨合一巷的优化支护方案,通过数值分析可知,优化支护方案能够维持巷道围岩的稳定,降低了巷道支护成本。 Optimization of support parameters in comprehensive transportation tunnel of No. 8 coal seam of Jinhuagong coal mine are carried out. Numerical model of comprehensive transportation tunnel by FLAC3D is established. Numerical simulation on primary support program is per- formed. Surrounding rock of the roof is relatively stable. Besides, axial force of bolt is much smaller than its limit load. According to the simula- tion results and field experience, support scheme of comprehensive transportation tunnel is optimized. Through numerical analysis, the optimized support scheme can maintain the stability of surrounding rock and reduce the support cost of the roadway.
作者 程子厚
出处 《山西建筑》 2015年第9期73-75,共3页 Shanxi Architecture
关键词 半煤岩巷 围岩 支护参数 数值模拟 half-coal and half-rock roadway, surrounding rock, support parameters, numerical simulation
  • 相关文献

参考文献4

二级参考文献61

共引文献966

同被引文献17

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部