期刊文献+

签订铁路货场搬迁协议注意事项

Matters Needing Attention of Signing Railway freight Yard Relocation Agreement
下载PDF
导出
摘要 随着城市规模的发展和货运量增加的需求,部分城市中既有铁路货场能力已不能满足实际货运量的需要,地方政府往往会提出搬迁和异地新建铁路货场的要求。为保证搬迁和异地新建铁路货场的顺利实施,铁路方与地方政府需要通过协商签订搬迁框架协议和投资协议2份文件。如何按照平等、诚信的原则签订这2份文件,此文对签订这2份文件的注意事项提出建议。以减少履行协议过程中的争议和双方承担的风险。 With the increase of demand, the development of the urban scale and traffic volume in some cities in the railway freight yard capacity can not meet the need of the actual freight, local governments tend to ask for relocation and build new railway freight yard. In order to ensure the smooth implement of the relocation and building new railway freight yard, railroad authorities and Iocal government need to sign framework and investment agreements through consultation. The matters needing attention of how to sign these two documents according to the principle of equality and sincerity are also proposed, in order to reduce dis- putes in the process of performance of the agreement and bear the risk of both sides.
作者 梁树祥
出处 《铁路工程造价管理》 2015年第2期43-46,共4页 Railway Engineering Cost Management
关键词 铁路货场 搬迁 框架协议 投资协议 注意事项 Railway freight yard Relocation The framework agreement The investment agreement Matters nee- ding attention
  • 相关文献

参考文献3

  • 1建规[1991]583号,建设项目选址规划管理办法[S].
  • 2铁计[2011]102号,关于进一步明确铁路基本建设项目审批管理程序的通知[S].
  • 3财综[2010]80号,政府性基金管理暂行办法[S].

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部