摘要
铁路建设投资规模巨大,为合理利用建设资金,控制建设成本,此文采用系统思维方式,从建设工程的时间性、系统性和造价的精确性方面阐述造价工作进行流程控制的重要性。并进一步论述造价工作与设计施工阶段、与专业、与概预算编制参数的对应关系。以求工程造价人员在勘察设计、施工、管理工作中,通过优化设计方案、施工组织设计和管理等,有效控制工程造价。
Railway construction investment scale is huge, to reasonably use construction funds, control the construction cost, this article uses the system thinking to expound the importance of cost work process control from the aspects of timeliness and systemic of construction project and the accuracy of the cost. Furthermore, it discusses the relationship between the cost work and the design construction stage, professional and the budget preparation parameters corresponding relation. For engineering cost personnel in survey and design, construction and management work, to effectively control the project cost by optimizing the design scheme, construction organization design and management, etc.
出处
《铁路工程造价管理》
2015年第2期56-58,共3页
Railway Engineering Cost Management
关键词
铁路建设
造价工作
系统思维
应用分析
Railway construction
Cost work
Systems thinking. Application analysis