摘要
对河南某新建金选厂进行选矿全流程考察,查明工艺流程中存在的问题,为改善选别效果提供依据和建议。
The complete flow investigation of one Henan new gold dressing plant was carried out, the existing problems in the process flow was found out, which supply the basis and suggestion for the improvement of mineral separation.
出处
《云南冶金》
2015年第2期33-38,共6页
Yunnan Metallurgy
关键词
金矿
选矿
流程考察
gold ore
mineral separation
flow investigation