期刊文献+

铜冠广场超高层桩基选型技术经济分析 被引量:3

Technical and Economic Analyses in Pile Foundation Selection for the Ultra High-rise Building in the Tongguan Plaza
下载PDF
导出
摘要 超高层桩基方案是整个结构设计中极为重要的环节。通过对合肥经济技术开发区中铜冠广场超高层项目主楼桩基选型技术经济分析,得出一套桩基设计方法:根据地质报告以及周围环境条件对地勘单位推荐桩型进行分析研究,结合本工程结构特点进行设计;通过对不同可选桩型就不同桩径、长度、持力层多维度的综合分析,得出符合承载力和沉降量要求的技术上可行、经济上合理的桩基方案。本工程选取了3种长螺旋钻孔灌注桩和3种人工挖孔桩共6种桩进行技术经济分析。 Pile foundation selection is an important task in the ultra high-rise building design.In this paper,technical and economic analyses in pile selection were discussed based on the a project in the Tongguan Plaza,which is located in Hefei Economic and Technological Development Zone.A pile foundation design procedure was proposed:(1) studying the geological report for the pile type recommended by geological exploration units and conducting preliminary design;(2) performing a detailed design to determine optional pile diameter,length,and holding force layer for a technically feasible and economically reasonable pile foundation design.During the Tongguan Plaza project,three kinds of long spiral bored piles and three types of artificial hole digging piles were compared by using the aforementioned method.
出处 《结构工程师》 北大核心 2015年第1期105-111,共7页 Structural Engineers
关键词 超高层 桩基选型 设计 经济分析 high-rise building pile foundation selection foundation design economic analysis
  • 相关文献

参考文献4

二级参考文献14

共引文献8

同被引文献12

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部