6Kite-powell H I, Di Jin.Investigation of potential risk factors for groundings of commercial vessels inU.S.Ports,International Journal of Offshore and Polar Engineering[J].Mar.1999,9(1).
7Amrozowicz M D.A probabilistic analysis of tankergroundings[A].ISOPE'97[C],1997.313-320.
8Tanaka H. Fault-tree analysis by fuzzy probability[J].IEEE transactions onreliability,1993,R-32(5):453-457.
9Singer D. A fuzzy set approach to fault tree and reliability analysis[J].Fuzzy Setsand Systems,1990,34:145-155.
10Amrozowicz M D. The quantitative risk of oil tanker groundings[D]. Naval EngineerThesis, Department of Ocean Engineering.Massachusetts Institute of Technology,June,1996.