摘要
文章对AP1000核电汽轮发电机组甩负荷试验进行了介绍,并与国内其他核电机组及常规火电机组的甩负荷试验进行了对比。讨论了相关的试验条件、试验方法、应采取的预防措施、注意事项及国外同类试验的经验反馈,提出了一些相关建议。
This paper introduces the turbine load shedding test of the world' s first APIO00 nuclear power plant, compares the test with those of other nuclear power plants and conventional thermal power plants. This paper discusses related test conditions, test methods, and preventive measures should be taken, matters to be noticed and similar foreign experience feedback, and puts forward some suggestions.
出处
《中国核电》
2015年第1期19-23,共5页
China Nuclear Power