EPC模式下核电厂可行性研究阶段设计的管理 被引量:1

Engineering Management at Feasibility Study Stage of Nuclear Power Plant under EPC Mode
下载PDF
导出
摘要 2004年,国务院进行投资体制改革后,国家发改委对企业投资建设核电厂实行核准制。可行性研究阶段是核电厂项目核准主线的关键阶段,它与执照申请、工程设计主线工作相互交叉,这对业主的设计管理工作提出了更高的要求。文章从EPC模式下业主的管理角度,对核电厂前期设计过程进行了梳理,着重介绍了核电厂可行性研究阶段的设计管理工作,并对可行性研究阶段进行的执照申请相关设计、工程设计等工作的管理内容进行了探讨。 After the investment reform by the State Council in 2004, NDRC carries out approval system for enterprises to invest in nuclear power plants. Feasibility study stage is a critical stage on the mainline of nuclear power project approval, which intersects with the license application, and engineering design. The owners of nuclear power plants are required stringently in engineering management. From the owners' management point of view under EPC mode, this paper sorts the preliminary project process for nuclear power plants, focusing on the management in the feasibility study stage. License application and engineering design management in the feasibility study stage are also discussed.
作者 王志强
出处 《中国核电》 2015年第1期59-63,共5页 China Nuclear Power
关键词 EPC模式 核电厂 可行性研究 设计管理 EPC mode nuclear power plant feasibility study engineering management
  • 相关文献

参考文献2

  • 1中华人民共和国国务院.国务院关于投资体制改革的决定[Z].2004-07-16.
  • 2NB/T20034--2010核电厂可行性研究报告内容深度规定[S].

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部