梨园水电站工程建设投资控制和管理 被引量:3

Overview on Construction Investment Control and Management of Liyuan Hydropower Station
下载PDF
导出
摘要 梨园水电站工程项目投资规模巨大、建设周期长、技术复杂、施工环节和制约因素较多,涉及股东、项目业主、设计、施工、监理等方方面面,影响其建设和经济效益的潜在因素很多。介绍梨园水电站工程建设过程中投资控制和管理工作的做法、经验和教训,以供促进、提升水电行业工程建设投资控制和管理水平参考、借鉴性。 Because of huge investment, long construction period, complex technology demand, difficult construction processes and numerous construction constraints, and related to shareholders, project owner, designer, constructors and supervisors, the construction and economic benefits of Liyuan Hydropower Station project are affected by many factors. The practices and experiences of investment control and management in the construction of Liyuan Hydropower Station are introduced herein for providing references to promote investment control and management of hydropower stations.
作者 李云生
出处 《水力发电》 北大核心 2015年第5期5-8,73,共5页 Water Power
关键词 投资控制 建设管理 梨园水电站 investment control construction management Liyuan Hydropower Station
  • 相关文献

参考文献2

  • 1中华人民共和国国家发展和改革委员会.水电工程设计概算编制规定[M].北京:中国电力出版社,2008.
  • 2中国水电顾问集团昆明勘测设计研究院.金沙江梨园水电站可行性研究报告[R].2012.

共引文献1

同被引文献34

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部