期刊文献+

金沙江中游梯级水电站集控中心规划研究综述 被引量:8

Overview of Planning and Research on Centralized Control Center of Cascade Hydropower Stations in the Middle Reaches of Jinsha River
下载PDF
导出
摘要 金沙江中游梯级水电站集控中心规划研究提出了全流域"统一调度、统一运行"的管理思路和流域梯级集控中心的总体建设构想。参考国内其他流域水电企业集控管理模式,结合金沙江中游特点,规划阶段提出流域集控系统结构由集控自动化系统、水调及水情测报系统、通信系统三部分组成,围绕这三个系统,阐述了云南金沙江中游水电开发有限公司开展流域梯级水电站集控中心规划研究的主要成果。 The planning and research on centralized control center of cascade hydropower stations in the middle reaches of Jinsha River proposes the management idea of "unified control and operation" for whole watershed as well as the overall concept of centralized control center construction. In refer to the centralized management mode of other domestic hydropower enterprises and combining with the features of watershed, the watershed centralized control system is structured with three components in planning phase, including integrated automatic control system, water dispatching and hydrological forecast system and communication system. The major achievements of planning and research on centralized control center of watershed cascade hydropower stations conducted by Yunnan Jinsha River Hydropower Co., Ltd. are elaborated herein.
出处 《水力发电》 北大核心 2015年第5期40-43,共4页 Water Power
关键词 流域水电开发 集控中心 规划 梯级水电站 金沙江中游 watershed hydropower development centralized control center planning cascade hydropower station the middlereaches of Jinsha River
  • 相关文献

参考文献4

  • 1方辉钦.现代水电厂计算机监控技术与试验[M].北京:中国电力出版社,2003.31-35.
  • 2吴秋峰,张佐.自动化系统计算机网络[M].北京:机械工业出版社,2006.
  • 3黄益芬.水电站水库优化调度研究[M].北京:中国水利水电出版社,1996.
  • 4李正凡.流域水电站远程集控运行技术及有关问题探讨[J].水电站机电技术,2009,32(6):46-47. 被引量:2

共引文献8

同被引文献94

引证文献8

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部