摘要
固结灌浆在工程施工中是重要的隐蔽工程,在正式施工前需要通过灌浆试验确定施工参数。从固结灌浆试验设计、施工、成果分析、质量检查等几个方面,对梨园水电站趾板固结灌浆试验进行了详细介绍。工程实践表明,固结灌浆试验设计技术参数是合理的,工艺是可行的,灌浆效果满足设计要求。
The consolidation grouting is an important hidden works in construction and the formal construction parameters must be determined by grouting tests. The plinth consolidation grouting tests in Liyuan Hydropower Station are described from the aspects of test design, construction, result analysis and quality inspection. The actual engineering practice shows that the experimental design parameters are reasonable, the process is feasible and the grouting effect meets design requirements.