大型发电机定子一次定位安装技术 被引量:3

Installation Technology of Large Generator's Stator with One-time Positioning method
下载PDF
导出
摘要 梨园水电站定子机座为钢板焊接结构,分8瓣出厂,定子在现场组焊、叠片和磁化试验。定子机座在安装间或机坑内组焊,叠片和磁化试验均在本机坑内完成。梨园水电站发电机定子采用一次定位安装,不作二次调整的施工工艺。实践证明,该技术能够保证叠装和安装质量,施工工艺可行。 The stator frames of generators in Liyuan Hydropower Station are welded steel plate structure with 8 sections, which will be welded, laminated and tested on construction site. The stator frame is mounted and welded together in installation room or foundation pit, and both the lamination and magnetization test are completed in pit. The stators in Liyuan Hydropower Station are installed by using the technology of one-time positioning method and no other adjustment. The actual installation has proved that this technology can ensure the qualities of frame weld and lamination, and the installation technology is feasible.
出处 《水力发电》 北大核心 2015年第5期98-100,共3页 Water Power
关键词 定子 大型水轮发电机 现场组焊 铁心叠装 梨园水电站 stator large hydro-generator on-site mounting and welding iron core lamination Liyuan Hydropower Station
  • 相关文献

参考文献7

共引文献14

同被引文献6

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部