期刊文献+

多孔大跨框架涵整体顶进施工技术 被引量:3

Construction techniques for integral top porous large span frame culvert
下载PDF
导出
摘要 结合朔黄铁路沧东工业区南北主干道下穿朔黄铁路顶进涵施工经验,从方案比选、施工关键技术等方面较详尽的介绍了长大箱涵的施工工艺和安全.特别是软地基处理、营运线加固、整体箱体顶进纠偏的重点技术做了详细阐述,为同类工程施工提供了有价值的参考. the combination of Shuohuang Railway North Cang Dong Industrial Zone under the main trunk road wear Shuohuang railway culvert construction experience,from scheme selection,key construction technology and other aspects detailed introduces the construction technology and safety grew up box culvert.Especially in detail the key technology of soft foundation treatment,strengthening the overall operating line,Box Jacking rectification,provides valuable reference for similar engineering construction.
作者 张新华
出处 《河北建筑工程学院学报》 CAS 2014年第4期8-10,18,共4页 Journal of Hebei Institute of Architecture and Civil Engineering
关键词 框架涵 顶进施工方 施工工艺 frame culvert jacking construction construction technology
  • 相关文献

同被引文献13

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部