期刊文献+

大型MA类钢桥面铺装高温性能加速加载试验研究 被引量:13

Accelerated Load Testing of High-Temperature Performance of Long-Span MA Steel Bridge Deck Pavement
下载PDF
导出
摘要 高温性能是浇注式沥青混凝土的薄弱环节.采用南非MLS66型加速加载设备,对港珠澳大桥拟采用的两种英国体系浇注式沥青(MA)钢桥面铺装结构进行大型直道高温性能加速加载试验.结果表明,用德国GA工艺生产的MA(即GMA)铺装结构高温性能可以达到甚至略优于英国传统工艺生产的MA铺装结构高温性能,采用GMA工艺解决了今后实桥桥面铺装施工时的生产工效问题,同时GMA浇注式沥青混凝土的性能可以达到英国标准体系要求. The mastic asphalt (MA) has a weak high-temperature performance. In the investigation, the high-tem- perature performance of two kinds of British-style MA steel bridge deck pavements to be used in Hong Kong-Zhuhai- Macao Bridge was tested under accelerated load by using MLS66. The results show that ( 1 ) the MA produced with German-style GA craft, namely GMA, is equivalent or even superior to that produced with the traditional British- style craft in terms of the high-temperature performance; and (2) GMA can solve the real production ergonomics problems of bridge deck pavements, and the MA performance can meet the British-style standard.
出处 《华南理工大学学报(自然科学版)》 EI CAS CSCD 北大核心 2014年第12期21-26,34,共7页 Journal of South China University of Technology(Natural Science Edition)
基金 国家自然科学基金重点资助项目(51038004) 国家重大科技支撑计划项目(2011BAG07B03)
关键词 浇注式沥青 钢桥面铺装 高温性能 加速加载试验 mastic asphalt steel bridge deck pavement high-temperature performance accelerated load testing
  • 相关文献

参考文献12

  • 1杨军,丛菱,朱浩然,崔娟.钢桥面沥青混合料铺装车辙有限元分析[J].工程力学,2009,26(5):110-115. 被引量:15
  • 2Rsto 01, Richtlinie fuer die standardisierung des ober- baues yon verkehrsflaechen ( German guideline for pave- ment design) [S].
  • 3ZTV Asphalt-Stb 01 (2001 ), Zusaetzliche technische ver- tragsbedingungen und richtlinien fuer den bau vonfahr- bahndecken aus asphalt (German guideline for thecre- ation of asphalt layers) [ S].
  • 4RDO-Asphalt 08 (2008), Richlinien fuer die rechnerische dinmensionierung des oberbaues yon verkehrsflaechen mit asphahdeckschicht [ S].
  • 5BS 1447 : 1988, Specification for mastic asphalt ( lime- stone fine aggregate) for roads, footways and pavings in building [ S].
  • 6EN 13108-6:2006, Bituminous mixtures-material specifi- cations-part 6 : mastic asphalt [ S ].
  • 7EN12697- 25 : 2005, Bituminous mixtures--test methods for hot mix asphalt [ S ].
  • 8BS EN12697- 25 : 2005, Bituminous mixtures--test meth- ods for hot mix asphalt [ S ].
  • 9罗桑,钟科,钱振东.钢桥面复合铺装结构永久变形预估[J].同济大学学报(自然科学版),2013,41(3):397-401. 被引量:12
  • 10田泽峰,范兴华,刘云全,等.足尺沥青路面加速加载试验实践导论[M].沈阳:东北大学出版社,2012:121-130.

二级参考文献22

  • 1宋存牛.层状路面结构体非线性温度场研究概况[J].公路,2005,50(1):49-53. 被引量:30
  • 2刘其伟,丁峰,朱俊,章荣福.钢混凝土组合箱梁沥青摊铺温度场试验[J].东南大学学报(自然科学版),2006,36(4):572-575. 被引量:14
  • 3逯彦秋,张肖宁,唐伟霞.桥面铺装层温度场的ANSYS模拟[J].华南理工大学学报(自然科学版),2007,35(2):59-63. 被引量:34
  • 4JGJ26-95.民用建筑节能设计标准[S].[S].,2000..
  • 5逯彦秋.钢桥桥面铺装层温度场的研究[D].哈尔滨:哈尔滨工业大学,2007.
  • 6Chen Wai-Fai. Bridge engineering handbook [M]. Boca Raton: CRC Press, 2000.
  • 7Yang Jun, Zhu Haoran, Cui Juan. Repeated load triaxial test on asphalt mixture of steel bridge deck and its simulation by FEM [C]. The 1st International Conference of EACEF, 2007.
  • 8Sheikh A H, Mukhopadhyay M. Geometric nonlinear analysis of stiffened plates by the spline finite strip method [J]. Computers and Structures, 1999, 8(4): 28- 36.
  • 9Chen Y. Distribution of vehicular loads on bridge girders by the FEA using ADINA: Modeling, simulation, and comparison [J]. Computers and Structures, 2000, 3(4): 51 -60.
  • 10Au F T K. Health monitoring and management of civil infrastructure systems [ J ]. Society of Photo-Optical Instrumentation Engineers ,2001,47 (6) :282-291.

共引文献304

同被引文献91

引证文献13

二级引证文献78

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部