摘要 小纪汗煤矿主排水泵房布置在复合岩层中,采用半圆拱型断面,宽6.04m,高8.92m,掘进断面50m2,为高帮大断面永久硐室,支护难度大、要求高。运用数值模拟方法分析得出了高帮大断面硐室围岩变形破坏特征为以两帮破坏为主的结论,提出了做好控顶工作的同时应着重加强帮部支护的设计思想。采用以高强锚杆、锚索为主体的锚网喷联合支护方案,有效地控制了围岩变形,收到了良好的支护效果。 Main drainage pump room was in combined rock. The semicircular-arch-shape pump cavern was 6. 04m wide and 8.92m high and its area reached 50m^2. For the high-wall and large-section permanent cavern, supporting was difficult. Applying numerical simulation method, it was obtained that two-side of the cavern was main failure location. Supporting design of reinforcing two-side sup- porting on the premise of controlling roof was put forward. After applying combined supporting projection of anchored mesh and spraying with high-strength anchored bolt and cable, surrounding rock deformation was controlled effectively and supporting effect was excellent.
出处 《煤矿开采》 北大核心 2015年第2期47-49,55,共4页 Coal Mining Technology
基金 国家科技支撑计划课题(2012BAK04B08) 天地科技公司研发项目(KJ-2013-TDKC-05) 天地科技开采设计事业部生产力转化基金项目(KJ-2013-TDKC-07)
关键词 高帮大断面硐室 围岩稳定性分析 锚杆支护 high-wall and large-section cavern stability analysis of surrounding rock anchored bolt supporting
  • 相关文献

参考文献4

二级参考文献26

共引文献85

同被引文献40

引证文献5

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部