期刊文献+

考虑维修效果与计划水平的预防维修决策优化 被引量:8

Preventive maintenance decision optimization considering maintenance effect and planning horizon
下载PDF
导出
摘要 预防维修是提高运行可靠性的重要措施.在周期预防维修政策和序列预防维修政策中同时引入了维修效果和有限计划水平.在构建维修优化模型时,考虑了工作间歇性对系统失效强度的影响,并将系统失效过程看作为失效计数过程,建立了基于累积失效计数的维修效果评估模型,进而假定预防维修费用为维修效果的函数关系以反映维修深度与维修成本的映射关系.最后,通过数值例子进行了说明,并与原有周期预防维修政策和序列预防维修政策进行了对比.结果表明,扩展的优化模型可以有效的降低维修费用率和提高系统运行可靠性. Preventive maintenance plays an important role on the operational reliability improvement. The maintenance effect and finite planning horizon are introduced into the basal periodic and sequential preventive maintenance policies simultaneously. When configuring maintenance optimization, the impact of the alter- nation between downtime and uptime on failure intensity is considered. The failure process is regarded as a failure-counting process, and then the maintenance effect assessment model based on cumulative-failure- counting is proposed. In addition, the preventive maintenance cost is developed to consider the maintenance effect as a function of allocated maintenance cost. Numerical examples show that the proposed method can reduce the maintenance cost rate and improve the operational reliability.
出处 《系统工程学报》 CSCD 北大核心 2015年第2期281-288,共8页 Journal of Systems Engineering
基金 国家自然科学基金资助项目(71222108 71373216 71471149) 内蒙古大学高层次人才引进科研启动资助项目(20700-5145131)
关键词 可修系统 预防维修 维修效果 计划水平 repairable system preventive maintenance maintenance effect planning horizon
  • 相关文献

参考文献17

  • 1Zhou X, Xi L, Lee J. Opportunistic preventive maintenance scheduling for a multi-unit series system based on dynamic program- ming[J]. International Journal of Production Economics, 2009, 118(2): 361-366.
  • 2Berrade M D, Cavalcante C A V, Scarf P A. Modelling imperfect inspection over a finite horizon[J]. Reliability Engineering and System Safety, 2013, 111(3): 18-29.
  • 3王文彬,赵斐,彭锐.基于三阶段故障过程的多重点检策略优化模型[J].系统工程理论与实践,2014,34(1):223-232. 被引量:15
  • 4程志君,杨征,郭波.基于PH分布近似的系统维修优化模型研究[J].系统工程学报,2010,25(1):137-144. 被引量:3
  • 5Wu S M, Zuo M J. Linear and nonlinear preventive maintenance models[J]. IEEE Transactions on Reliability, 2010, 59(1): 242-249.
  • 6Chun Y H. Optimal number of periodic preventive maintenance operations under warranty[J]. Reliability Engineering and System Safety, 1992, 37(3): 223-225.
  • 7苏春,陈武.基于滚动窗口方法的风力机动态机会维修优化[J].机械工程学报,2014,50(14):62-68. 被引量:21
  • 8Dagpunar J S, Jack N. Preventative maintenance strategy for equipment under warranty[J]. Microelectronics Reliability, 1994, 34(6): 1089-1093.
  • 9Jaturonnatee J, Murthy D N P, Boondiskulchok R. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1): 201-215.
  • 10Pongpech J, Murthy D N P. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering and System Safety, 2006, 91 (7): 772-777.

二级参考文献94

  • 1马保国,张继强,刘长新.航材可修件复合泊松需求下的库存决策[J].中国管理科学,2004,12(z1):177-180. 被引量:6
  • 2苏保河,史定华.修理工可多重休假的n部件串联可修系统可靠性分析[J].数理统计与应用概率,1995,10(1):78-82. 被引量:13
  • 3汤胜道,汪凤泉.失效率随时间而变的n中取k表决系统可靠性分析[J].系统工程学报,2005,20(5):555-558. 被引量:19
  • 4左洪福,张海军,戎翔.基于比例风险模型的航空发动机视情维修决策[J].航空动力学报,2006,21(4):716-721. 被引量:50
  • 5Feng Q, Peng H, Coit D W. A degradation-based model for joint optimization of burn-in, quality inspection, and maintenance: A light display device application[J]. International Journal of Advanced Manufacturing Technology, 2010, 50(5-8): 801-808.
  • 6Parashar B, Taneja G. Reliability and profit evaluation of a PLC hot standby system based on a master-slave concept and two types of repair facilities[J]. IEEE Transactions on Reliability, 2007, 56(3): 534-539.
  • 7Kim M J, Makis V. Optimal maintenance policy for a multi-state deteriorating system with two types of failures under general repair[J]. Computers and Industrial Engineering, 2009, 57(1): 298-303.
  • 8Delia M C, Rafael P O. A maintenance model with failures and inspection following Markovian arrival processes and two repair modes[J]. European Journal of Operational Research, 2008, 186(2): 694-707.
  • 9Tian Z, Liao H. Condition based maintenance optimization for multi-component systems using proportional hazards model[J]. Reliability Engineering and System Safety, 2011, 96(5): 581-589.
  • 10Christer A H, Waller W M. Reducing production downtime using delay time analysis[J]. Journal of the Operational Research Society, 1984, 35(6): 499-512.

共引文献44

同被引文献33

引证文献8

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部