摘要
引用住建部2011科技计划项目"快速公交系统通行能力研究"中的模型和方法,以厦门BRT为例,对高架BRT系统通行能力进行定量分析,同时将高架BRT和不同制式的地面BRT通行能力进行对比分析,并结合厦门BRT系统的建设运营经验,提出了提升高架BRT通行能力的工程措施。
This paper referenced to the models and methods from a science and technology plan project dominated by Ministry of Housing and Urban-Rural Construction in 2011 whose name is capacity study of bus rapid transit system.The paper quantitatively analyzed the capacity of Xiamen elevated BRT(bus rapid transit)system,and further compared the capacity between different standard of ground BRT and elevated BRT.Then combining with the experience of construction and operation in Xiamen BRT system,the paper proposed some engineering measures to improve the capacity of elevated BRT.These measures have reference significance for the planning,design,construction and operation of BRT system.
出处
《交通科技》
2015年第2期136-139,共4页
Transportation Science & Technology
关键词
快速公交
通行能力
计算模型
高架BRT
高架公交专用路
bus rapid transit
traffic capacity
calculation model
elevated BRT
elevated bus-only lanes