期刊文献+

康山蓄滞洪区分洪口门设计方案分析比选 被引量:1

Analysis and comparison of flood diversion port gates in Kangshan Mountain flood detention basin
下载PDF
导出
摘要 康山蓄滞洪区为重要蓄滞洪区,分洪口门设计关系到蓄滞洪区启用的成败。本文对三种方案分别从分洪口门的启用灵活性、分洪可靠性、工程投资及运行管理等方面进行综合分析比较,最终推荐康山蓄滞洪区分洪口门采用1/2分洪闸+1/2扒口分洪口门方案。 Kangshan Mountain flood detention basin is an important flood detention basin,and flood diversion port gate design is related to the success of using flood detention basin.In the paper,three plans are analyzed and compared comprehensively in the aspects of flood diversion port gate starting flexibility,flood diversion reliability,project investment,operation management,etc.respectively.It is finally recommended that 1 /2 flood diversion port + 1 /2 artificial levee breach flood diversion port plan is adopted for flood diversion port gate in Kangshan Mountain flood detention basin.
作者 刘文标 孙敏
出处 《水利建设与管理》 2015年第4期25-28,共4页 Water Conservancy Construction and Management
关键词 蓄滞洪区 分洪口门 设计方案比选 flood detention basin flood diversion port gate design plan comparison
  • 相关文献

参考文献6

二级参考文献3

共引文献1

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部