摘要
本文通过柳树沟水电站模型试验,对消能结构优化设计情况进行了研究分析,试验结果显示T字墩+消力池的结构形式在该类电站中能够取得比较理想的消能效果。
In the paper,energy dissipation structure optimization design condition is studied and analyzed through the model test of Liushugou Hydropower Station. Test results show that structure form of T-shaped pier + stilling basin can achieve more ideal effect of energy dissipation in similar power plants.
出处
《中国水能及电气化》
2015年第4期53-56,38,共5页
China Water Power & Electrification
关键词
水电站
消能结构
消力池
T字墩
hydropower station
energy dissipation structure
stilling basin
T-shaped pier