南水北调湍河渡槽工程为相对独立的三线三槽单跨40m的双向全预应力结构U形薄壁渡槽,槽身混凝土等级为C50W8F200。渡槽槽体结构新颖,受力复杂,结构尺寸及施工技术较为复杂。该工程通过调整入仓方式,采用薄层浇筑、二次复振的方法,保证了槽身混凝土质量,施工效果良好。
Aqueduct work in South-to-North Water Diversion Project belongs to relatively independent three-wire three-tank single-span 40 m two-way full pre-stressed structure U-shaped thin-wall aqueduct. Tank concrete grade is C50W8F200.Aqueduct tank is characterized by novel structure,complex mechanical force,more complex structure size and construction technique. In the project,tank concrete quality is ensured through adjusting warehousing modes and adopting thin layer pouring and secondary complex vibration methods with excellent construction effect.
出处
《中国水能及电气化》
2015年第4期57-60,共4页
China Water Power & Electrification
关键词
渡槽
混凝土
入仓方式
aqueduct
concrete