摘要
CSG新型筑坝技术,具有经济、环保、便捷的特点。为此,以贵州北盘江马马崖一级水电站为例,介绍了CSG筑坝技术在围堰施工中的应用情况,简述CSG材料试验,总结CSG围堰施工经验,指出存在问题,为类似工程提供参考。
CSG dam construction technology renders less cost, is environmentally friendly and permits convenientconstruction. Mamaya I Hydropower Station is located on Beipan River in Guizhou Province. An introduction wasmade on the application of CSG technology in the cofferdam construction of this project. The authors also presentthe CSG material test, summarize experience in cofferdam construction with CSG technology, and point out the exist-ing problem, so as to provide reference for similar projects.
出处
《广西水利水电》
2015年第2期49-52,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
CSG
贫胶砂砾料
围堰
施工
CSG
poor glue gravel
cofferdam
construction