白岩塘水库大坝年久失修,经稳定复核,不能满足规范要求。为此,对大坝、溢洪道、放水建筑物等进行加固设计,并简介其施工技术要点。加固后,工程运行正常,达到设计要求。
Main dam of Baiyantang Reservoir had been in bad repair for long years. The results of stability recheckindicate that it is not up to requirements of specifications. Reinforcement design was conducted for main dam, spill-ways and water relief structures. A brief introduction was made on the key points of construction technology. Theproject has operated normally up to design requirements since the reinforcement construction was completed.