期刊文献+

The Year of Nuclear Power

The Year of Nuclear Power
原文传递
导出
摘要 Two generating units--titled No.5 and 6---of Hongyanhe Nuclear Power Plant in northeast China's Liaoning Province were approved for construction in March, re- suming China's nuclear power program after Japan's nuclear crisis in 2011. On April 15, the State Council executive meeting approved the construction of a pilot unit by Fuqing Nuclear Power Plant in southeast China's Fujian Province, using the Hualong One reac- tor design, a domestically developed third- generation nuclear reactor design. 2015 sees a surge of several new nuclear power projects in China By Wang JunTwo generating units—titled No.5 and6—of Hongyanhe Nuclear Power Plant in northeast China’s Liaoning Province were approved for construction in March,resuming China’s nuclear power program after Japan’s nuclear crisis in 2011.On April 15,the State Council executive meeting approved the construction of a pilot unit by Fuqing Nuclear Power Plant in southeast China’s Fujian Province,using the Hualong One reactor design,a domestically developed thirdgeneration nuclear reactor design.This year will see the beginning of the greatest number of nuclear power projects in a single year in China since the 2011 crisis,with six to eight units being approved and eight units going online,said Zhang Huazhu,Chairman of the China Nuclear Energy Association(CNEA),at the annual conference of the association on April 22.According to CNEA figures,China
作者 Wang Jun
机构地区 [
出处 《Beijing Review》 2015年第19期36-37,共2页 北京周报(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部