摘要
本文以某钢铁厂为例,就变更环评中项目背景及必要性、项目建设实施情况回顾、影响预测分析及总量控制等问题进行了探讨。
The paper discusses the project background and necessity, review of the project construction, impact prediction analysis and the total pollutant amount of the alteration EIA for industrial pollution type construction project from the case study of a steel plant project.
出处
《环境与可持续发展》
2015年第2期83-84,共2页
Environment and Sustainable Development
关键词
变更环评
回顾性评价
钢铁厂
alteration EIA
retrospective evaluation
steel plant