华安水电站扩建工程引水隧洞塌方处理技术 被引量:3

Treatment Technology for the Collapse of Diversion Tunnels in the Expansion Work of Hua'an Hydropower Station
下载PDF
导出
摘要 为解决华安水电站扩建工程引水隧洞施工过程中的塌方问题,对其塌方的特点及成因进行了研究,提出了搞好隧洞初期支护、把握好穿越塌方体施工的过程、采用深层固结灌浆提高围岩稳定性等措施,经过施工期的安全监测和一年运行观测,该洞段围岩稳定,表明措施有效。 In the expansion work of Hua ’ an Hydropower Station, collapse accidents are encountered during the con-struction of the diversion tunnels.Characteristics and possible causes of the collapse accidents are investigated.Treat-ment measures are then proposed, such as the good primary support, the proper construction procedure through the col-lapse rock, the deep consolidation grouting to increase the stability of surrounding rocks.Safety monitoring in the con-struction period and one-year’ s operation shows that the tunnel surrounding rocks are now stable, which illustrates the effectiveness of the proposed measures.
作者 顾新刚
出处 《水电与新能源》 2015年第4期9-11,15,共4页 Hydropower and New Energy
关键词 引水隧洞 塌方 处理技术 华安水电站 diversion tunnel collapse treatment technology Hua’ an Hydropower Station
  • 相关文献

参考文献2

  • 1DL/T5148-2001.水工建筑物水泥灌浆施工技术规范[S].[S].,..
  • 2SL377-2007,水利水电工程锚喷支护技术规范[S].

共引文献121

同被引文献11

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部