摘要
介绍了铁路桥梁工程中桩基础的施工准备工作,着重对钻孔灌注施工、钢筋笼施工、混凝土灌注施工等桩基础施工技术要点进行了阐述,以提高桥梁工程中桩基础的施工技术水平。
This paper introduced the pile foundation construction preparatory work of railway bridge engineering, emphatically elaborated the casl- in-place construction, steel cage construction, concrete pouring construction and other pile foundation construction technology key points, in order to improve the construction technology level of bridge engineering.
出处
《山西建筑》
2015年第10期171-172,共2页
Shanxi Architecture
关键词
铁路
桥梁
桩基础
技术要点
railway, bridge, pile foundation, technology key points