摘要 为减少布沼坝西帮削帮减载治理过程中爆破振动对高陡边坡的影响,维护到界边坡的稳定性,采用非电延时控制爆破技术,分台阶分层爆破开挖,沿到界边坡线进行预裂爆破.通过现场爆破试验与爆破振动测试相结合的方法,得到适合于削帮减载治理工程的爆破方案及满足到界边坡稳定成型的预裂爆破方案的参数范围,并验证了考虑高程的振速预测公式在本工程的适用性. In order to reduce the influence of blasting vibration on the slope and maintain the stability of the final slope during the process of wall cutting and unloading management, this paper introduced the non-electric delay controlled blasting technology and excavation in layers and steps. Pre-splitting blasting was used in the final wall. Combining the field blasting experiment and blasting vibration test, this paper obtained the reasonable blasting scheme which is suitable for the wall cutting and unloading engineering, and parameter limits of pre-splitting blasting which is satisfied for the final slope. The velocity prediction formula considering elevation is verified for its applicability in this project.
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2015年第4期442-446,共5页 Journal of Liaoning Technical University (Natural Science)
基金 高等学校博士点基金项目(20120023110007) 博士研究生拔尖创新人才培育基金(800015Z677) 国家自然科学基金项目(51304087)
关键词 高陡边坡 削帮减载 边坡治理 预裂爆破 振动测试 high-steep slope wall cutting and unloading slope management pre-splitting blasting vibration test
  • 相关文献

参考文献11

二级参考文献66

共引文献115

同被引文献10

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部