摘要
介绍首钢股份迁安钢铁公司M251S型纯燃高炉煤气联合循环发电热力系统,优化热力系统参数,提高了联合循环发电(CCPP)的连续最大出力,为钢铁厂建设高效联合循环发电机组提供借鉴。
The thermodynamic system of M251 S gas-steam combined cycle power generating plant(CCPP) using blast furnace gas is introduced. The parameters of thermodynamic system were optimized, which has increased the continuous maximum output of CCPP, providing reference for construction of high-efficiency CCPP in steel companies.
出处
《冶金动力》
2015年第6期35-38,41,共5页
Metallurgical Power
关键词
联合循环发电
热力系统
参数
优化
CCPP
thermodynamic system
parameter
optimization