黄河黄丰水电站右岸复合土工膜砂砾石坝设计 被引量:2

Design of Sand Gravel Dam with Composite Geomembrane on Right Bank,Huangfeng Hydropower Project
下载PDF
导出
摘要 黄丰水电站工程右岸土石坝采用混凝土防渗墙与复合土工膜联合防渗结构。简要介绍土石坝上游坝坡防渗体系设计、坝体整体的渗流计算、稳定计算以及复合土工膜与上下保护层料之间的抗滑稳定性分析。经计算,坝体整体渗流量相对多年平均流量较小,可忽略不计;上游坝坡采用加糙复合土工膜或设置防滑槽形式铺设,稳定性满足规范要求。 The combined impervious structure of concrete cutoff wall and composite geomembrane is applied in the earthrock fill dam on right bank of Huangfeng Hydropower Project.In the paper, design of the impervious system of the upstream dam slope of the earthrock fill dam, the integrated seepage and stability calculations of the dam body, and analysis on the stability against sliding between the composite geomembrane and both up and down protection layer materials are described.Through calculation, the integrated seepage of the dam body, compared with the average carryover discharge, is lower.It can be ignored.The roughened geomembrance is applied at the up-stream dam slope or the geomembrane is laid with trough against sliding.Specification on stability is satisfied.
出处 《西北水电》 2015年第2期48-52,共5页 Northwest Hydropower
关键词 复合土工膜 防渗体系 稳定计算 抗滑措施 composite geomembrane impervious system stability calculation measures against sliding
  • 相关文献

参考文献10

二级参考文献8

  • 1魏红卫,喻泽红,邹银生.土工合成材料加筋土抗剪作用的试验研究[J].水利学报,2005,36(5):555-562. 被引量:30
  • 2土工合成材料工程应用手册编写委员会.土工合成材料工程应用手册[M].北京:中国建筑工业出版社,2000..
  • 3SL274—2001.碾压式土石坝设计规范[S].[S].,..
  • 4南京水利科学研究院.SL237-1999土工试验规程[S].北京:中国水利出版社,1999.
  • 5南京水利科学研究院,中国土工合成材料工程协会.SL/T235-1999土工合成材料测试规程[S].北京:中国水利出版社1999.
  • 6《土工合成材料工程应用手册》编写委员会.土工合成材料工程应用手册[K].2版.北京:中国建筑工业出版社,2000:118-126.
  • 7石广斌.黄河苏只水电站工程右岸土石坝坝型优化设计专题研究[R].西安:西北勘测设计研究院,2004.
  • 8颜宏亮.有限深透水地基上土工膜斜墙土坝的渗流计算[J].山东水利科技,1997(3):5-6. 被引量:2

共引文献40

同被引文献9

引证文献2

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部