摘要
结合衡阳金色蓝庭项目的施工实例,主要就转换层模板施工技术进行了探讨,阐述支撑层数确定、转换层模板及支撑设置、计算、模板及支撑拆除等施工要点,为类似结构施工提供技术参考。
Combining with the construction of Jinselanting program in Hengyang, the paper explores from the transfer layer construction, and illustrates some construction points from the identification of the support layers, transfer layer, support allocation, calculation, framework, and support demolition, so as to provide some technical reference for similar structural construction.
出处
《山西建筑》
2015年第13期115-117,共3页
Shanxi Architecture
关键词
高层建筑
转换层
模板
设置
支撑
high-rise building, transfer layer, framework, allocation, support