摘要 AP1000是二环路的百万千瓦级压水堆三代核电堆型,采用非能动安全设施。与传统的三环路CPR1000压水堆核电技术相比,蒸汽发生器本体特征和核岛内的就位要求均有较大的改进性变化。根据AP1000及CPR1000蒸汽发生器SG自身吊装特点,并在实践的基础上,对两种堆型核电机组的蒸发器吊装技术进行对比、分析、总结,为后续中国核电蒸发器设计、施工提供经验。 AP1000 is the third generation of million kilowatt pressurized water nuclear power plant with two ring roads, which uses the active safety facilities. Compared with CPR1000 pressurized water reactor nuclear power technology with third roads, the characteristics and in place within the nuclear island requirements of steam generator have improvement change. In this paper, according to the hoisting characteristics of APt000 and CPR1000 steam generator, and on the basis of practice, through to steam generator hoisting technology of the two type of reactor comparison, analysis, and summary, it will provide experience for the follow-up design and construction of Chinese nuclear steam generator.
出处 《装备制造技术》 2015年第4期149-152,共4页 Equipment Manufacturing Technology
关键词 AP1000 CPR1000 蒸发器 吊装 技术 对比 steam generator hoisting technology comparison
  • 相关文献

参考文献4

二级参考文献27

  • 1张伟,边信黔,夏国清.套管式直流蒸汽发生器静态和动态特性的仿真研究[J].中国电机工程学报,2007,27(5):76-80. 被引量:12
  • 2蒲小芬,EM2.1安装包-主回路安装总体技术要求,B版,54,中国核动力研究设计院,2006.
  • 3李燕,EM2.2安装包-反应堆主设备安装总体技术要求,B版,15,中国核动力研究设计院,2007.
  • 4蒲小芬,反应堆冷却剂系统设备就位图册,A版,18,中国核动力研究设计院,2005.
  • 5孙涛,核岛安装活动的质量保证分级要求,A版,21,核工业第二研究设计院,2006.
  • 6崔岚,建造阶段现场清洁和清洁度,A版,24,核工业第二研究设计院,2006.
  • 7王园,蒸汽发生器支承安装技术条件,A版,21,中国核动力研究设计院,2007.
  • 8何劲松,蒸汽发生器设备规格书,A版,52,中国核动力研究设计院,2005.
  • 9王园,蒸汽发生器支承间隙调整技术条件,A版,41,中国核动力研究设计院,2007.
  • 10丁训慎.压水堆核电站蒸汽发生器的制造.核电站,2003,.