期刊文献+

印尼TJK电厂65MW高压汽轮机负胀差偏大的探究 被引量:1

Exploration on negative expansion difference larger for 65 MW high pressure steam turbine in TJK Power Plant of Indonesia
下载PDF
导出
摘要 针对印度尼西亚TJK电厂65 MW机组投运后存在的"极热态启动时负胀差偏大而且超限"问题,通过技术分析找出主要原因,制定出改造方案并在大修中实施。改造结果表明:该方案解决了机组在极热态启动时负胀差偏大的问题,大修后机组实现了随启随停。 Aiming at the problem that negative expansion difference is big and over the limit when the units extreme hot start of 65 MW unit after the commission in TJK Power Plant of Indonesia, finds out the main causes by technical analysis,frames the improvement project and puts in heavy repair practice. The improvement result shows that the project solve problem of negative expansion difference is big when the units in extreme hot start,after heavy repair the unit realizes start-up and shut-down at any time.
作者 陈永军
出处 《宁夏电力》 2015年第2期69-72,共4页 Ningxia Electric Power
关键词 极热态启动 负胀差 轴封改造 extreme hot start negative expansion difference axial seal retrofit
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部