摘要
城市建设发展速度飞快,城市老城区构建筑物进行着迅速更新。城市地铁盾构区间部分需要穿越既有桥梁,若桥梁桩基础侵入区间隧道,在盾构穿越前需要对老桥梁拆除和桩基拔除,在原有桥梁位置新建桥梁避开盾构区间,桥梁拆除前,在桥梁附件搭设一座钢便桥确保交通通畅。文章对贝雷钢便桥验算及搭设进行了详细阐述。
City construction development speed quickly, the old city city building structure with rapid update. Nanjing metro line three station to Confucius Temple Station Bailuzhou shield interval, need to pass through Pingjiang the Qinhuai River bridge, the bridge pile foundation in intrusive tunnel, shield crossing before the need to bridge girder dismantle and pile extraction, avoid shield interval in the original bridge location of new bridge, bridge demolition before, in bridge on the north side of the erection of a steel bridge to ensure smooth traffic. In this paper the Bailey steel bridge checking and erection in detail.
出处
《江苏科技信息》
2015年第11期54-55,共2页
Jiangsu Science and Technology Information
关键词
贝雷梁
悬臂推桥法
验算
bailey beam
cantilever pushing bridge method
checking calculation