摘要
中国铁路高速发展,大型高铁站房对机电安装的质量要求越来越高,安装施工前,传统的机电安装主要在设计院提供的蓝图基础上,对各专业管线进行叠加、对重要部位绘制局部剖面,普遍存在不能详细反映整体管线走向、多专业管线碰撞检测难的问题。因此,需要施工单位对设计蓝图进行深入综合分析,对设计图纸进行具体化、精细化。在南宁东站工程中,应用三维管线综合排布技术及MagiCAD三维软件,对机电安装图纸进行了三维设备管线综合排布的深化设计,形成了一整套机电安装工程深化设计技术。
The China railway high-speed development,large high-speed room for mechanical and electrical installation quality requirements more and more high,traditional mechanical and electrical installation mainly based on the design institute to provide blueprint,superposition,the important part for each professional line to draw local section before installation,which cannot reflect the whole pipe route, more professional pipeline in detail,the difficulty of collision detection ubiquity. Therefore,it was needed that the construction unit to design blueprint for further comprehensive analysis,the design drawings for the concretization and intensification. Nanning east station engineering comprehensive configuration technology and the application of three-dimensional pipeline MagiCAD three-dimensional software,mechanical and electrical installation drawings for the three-dimensional pipeline equipment comprehensive deepening of configuration design,and formed a whole set of machine electric installation engineering design technology.
出处
《工程质量》
2015年第4期83-86,共4页
Construction Quality
关键词
机电安装
MagiCAD三维软件
综合排布
mechanical and electrical installation
MagiCAD three-dimensional software
comprehensive arrangement