摘要 以天津某超高层工程为例,介绍了大直径超长钻孔灌注桩试桩方法和工艺,包括试桩成孔工艺、灌注桩施工工艺和试桩工艺。主要介绍了成孔施工过程的要求,双护筒的设计与施工,反力系统的设计与制作,监测系统设置以及加载方式等。 Based on an engineering practice in Tianjin, this paper introduced testing pile process and methods of the large and super-long bored pile, such as testing pile process, pile-forming and testing. The requirement in pore-forming construction, design and construction of double protecting sleeve, reaction system design, monitoring system setting and loading mode were introduced in detail.
出处 《施工技术》 CAS 北大核心 2015年第7期90-92,98,共4页 Construction Technology
关键词 桩基础 高层建筑 试桩 施工工艺 监测 piles tall buildings testing piles construction monitoring
  • 相关文献

参考文献4

  • 1柯洪,吴翔,王继华,曾云川,赵春宏,冯庆高.天津厚地层超长钻孔灌注桩单桩承载特性研究[J].岩土力学,2011,32(9):2821-2826. 被引量:17
  • 2訾兵,汪浩.117塔楼试桩施工方案报告[R].武汉:中建三局建设工程股份有限公司,2009.
  • 3孙应,吴永红.117塔楼试桩单桩竖向抗压静载荷试验报告[R].天津:天津勘察院,2009.
  • 4JGJl06-2003建筑基桩检测技术规范[S].北京.中国建筑工业出版社,2003.

二级参考文献11

共引文献30

同被引文献40

引证文献7

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部