盾构管片弧形钢板预埋件黏贴法施工工艺研究 被引量:5

Research on Paste Method's Construction Technology of Shield Segment Arc Steel Plate Embedded Parts
下载PDF
导出
摘要 盾构管片弧形钢板预埋件是三维空间,不是简单的平面问题,保证其设计位置有一定难度。依据某输电工程(电缆隧道)盾构管片生产线,提出采用双面胶粘贴法固定弧形钢板预埋件的方案,经过工程实际验证取得了良好效果,一方面较好保证了预埋件安装质量,另一方面节约了人工和材料费用。 Arc plate embedded parts of shield segment lining is three dimensional space, and it’ s not a simple plane problems. It’ s difficult to ensure the design position. According to the a power transmission project ( cable tunnel) production line of shield segment lining, double-sided adhesive paste method is presented in this paper to a fixed arc plate scheme of embedded parts. Engineering practice shows that good effect was obtained, the quality of the embedded parts installation was ensured and the labor and material cost has reduced.
出处 《施工技术》 CAS 北大核心 2015年第7期120-121,共2页 Construction Technology
关键词 盾构 管片 电缆隧道 弧形钢板预埋件 粘贴法 shields segments cable tunnel arc steel plate embedded parts paste method
  • 相关文献

参考文献5

二级参考文献16

共引文献31

同被引文献17

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部