摘要
根据大同美术馆整体滑移施工全过程有限元分析结果,制定了对本工程钢结构施工过程和运营阶段关键部位的应力-应变和位移的监测方案。详细介绍了测点布设、监测系统组成以及监测系统的运行等内容,提出了合理的监测预警体系。
By simulation analysis for the whole slide construction process in Datong Art Gallery, monitoring scheme was made for stress-strain and displacement of key parts in steel structure construction process and operation stages. The monitoring points setting, composition and operation of the monitoring system are described in detail. Furthermore, a reasonable early warning system was proposed, which provided reference for similar steel structure monitoring.
出处
《施工技术》
CAS
北大核心
2015年第8期67-70,79,共5页
Construction Technology
关键词
钢结构
施工监测
应力
应变
变形
steel structures
monitoring
stresses
strain
deformation