火电厂脱硫废水处理工程实例 被引量:15

AN ENGINEERING EXAMPLE OF DESULFURIZATION WASTEWATER TREATMENT IN A POWER PLANT
下载PDF
导出
摘要 针对国内外火力发电厂采用中和沉淀法来治理烟气脱硫产生的脱硫废水,经该工艺处理后的废水中重金属离子均能稳定达标排放,但COD和SS往往不能稳定达标排放的问题,某电厂脱硫废水工程采用了改造和优化的中和沉淀工艺。试运行结果表明,该工艺能解决管道易堵塞和管理维护量大的问题,经处理后的出水水质稳定,达到了DL/T997-2006的要求。 The neutralization-precipitation methods were employed to treat desulfurization wastewater in many power plants at home and abroad nowadays. The index of heavy metal ions concentration in the wastewater could stably meet discharging standard after the treatment by this process, but the chemical oxygen demand (COD) and suspended solids (SS) often could not. To solve this problem, the transformed and optimized neutralization-sedimentation process was adopted in a power plant desulfurization wastewater project. Pilot rim results showed that the easy blockage of the pipeline and heavy task of management and maintenance could be solved effectively by this process, and the stable effluent quality after the treatment could also meet the requirements in DL/T 997--2006.
出处 《水处理技术》 CAS CSCD 北大核心 2015年第5期128-131,135,共5页 Technology of Water Treatment
关键词 脱硫废水 污泥 加药系统 desulfurization wastewater sludge dosing system
  • 相关文献

参考文献4

  • 1国家环保总局.燃煤二氧化硫排放污染防治技术政策的规定(环发(2002)26号)[EB/OL].http://govinfo.nlc.gov.cn/hbsfz/xxgk/hbsd/201111/0111121-1108678.html?classid=416.
  • 2陈泽峰,冯铁玲.电厂脱硫废水处理[J].工业水处理,2006,26(3):86-88. 被引量:55
  • 3DL/T997--2006火电厂石灰石一石膏湿法脱硫废水控制指标[S].
  • 4DB44/26--2001,水污染物排放限值[S].

二级参考文献2

共引文献55

同被引文献200

引证文献15

二级引证文献122

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部