本文通过郑徐客专站前工程桥梁桩基、承台、墩身施工中钢筋加工场的整体布置与规划,重点介绍根据工期要求进行钢筋场的整体布置与规划;根据施工工艺及流水线作业方式确定钢筋场加工各功能区的规划;根据建设单位施工现场标准化管理要求,实现统筹规划,合理布局,节约用地,注重实用,符合标准。
Through the overall arrangement and planning of the reinforcement yard in the construction of pile foundation, pile caps, bridge pier in Zhengxu passenger station project, this paper mainly introduces the overall arrangement and planning of the reinforcement yard by the requirements of construction period, determines the planning of each functional area of the reinforcement yard by the construction technology and assembly line work, achieves the overall planning, rational layout, economical use of land, attention on practical, and standard conformation by the standardization management requirements of construction site of the project unit.