期刊文献+

考虑运输能力限制的跨单元调度方法 被引量:6

An Inter-cell Scheduling Approach Considering Transportation Capacity Constraints
下载PDF
导出
摘要 工件在生产单元之间频繁转移产生了跨单元调度问题.本文结合我国装备制造业的生产实际,提出考虑运输能力的跨单元调度方法,设计了一种基于离散蜂群与决策块结构的超启发式算法.针对传统超启发式算法的局限性提出动态决策块策略,同时改进传统蜂群算法的侦查蜂策略,使之具有更好的优化性能.实验表明,动态决策块具有比静态决策块更好的性能,算法在优化能力和计算效率的综合性能上优势显著,并且问题的规模越大,优势越明显. The issue of inter-cell scheduling arises due to some exceptional parts having to be processed and transported frequently in different cells. This work is inspired by the equipment manufacturing industry of China. Aimed at the inter-cell scheduling problem with transportation capacity constraints, a hyper-heuristic based on discrete artificial bee colony approach and decision block is proposed, in which a dynamic decision block strategy is developed and the scout bee strategy is improved. Experimental results show that the proposed approach outperforms the traditional static decision block strategies, and has a better performance with respect to the overall performance of optimization capability and computation e?ciency, which is especially more suitable for large dimension scheduling problems.
出处 《自动化学报》 EI CSCD 北大核心 2015年第5期885-898,共14页 Acta Automatica Sinica
基金 国家自然科学基金(71401014) 北京市自然科学基金(4122069)资助~~
关键词 跨单元调度 运输能力 超启发式 决策块 人工蜂群算法 Inter-cell scheduling, transportation capacity, hyper-heuristic, decision block, artificial bee colony algorithm
  • 相关文献

参考文献19

  • 1Li D N, Wang Y. Production scheduling in intercell cooperative production mode. In: Proceedings of the 24th Chinese Control and Decision Conference (CCDC). Taiyuan: IEEE, 2012. 504-506.
  • 2Garza O, Smunt T L. Countering the negative impact of intercell flow in cellular manufacturing. Journal of Operations Management, 1991, 10(1): 92-118.
  • 3Johnson D J, Wemmerlov U. Why does cell implementation stop? factors influencing cell penetration in manufacturing plants. Production and Operations Management, 2004, 13(3): 272-289.
  • 4Li D N, Meng X W, Li M, Tian Y N. An ACO-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine. Journal of Intelligent Manufacturing, DOI: 10.1007/s10845-013-0859-2.
  • 5Mosbah A B, Dao T M. Optimimization of group scheduling using simulation with the meta-heuristic extended great deluge (EGD) approach. In: Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). Macao: IEEE, 2010. 275-280.
  • 6Yousef G K, Reza T M, Amir K. Solving a multi-criteria group scheduling problem for a cellular manufacturing system by scatter search. Journal of the Chinese Institute of Industrial Engineers, 2011, 28(3): 192-205.
  • 7Solimanpur M, Elmi A. A tabu search approach for group scheduling in buffer-constrained flow shop cells. International Journal of Computer Integrated Manufacturing, 2011, 24(3): 257-268.
  • 8Tang J F, Wang X Q, Kaku I, Yung K L. Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach. Journal of Intelligent Manufacturing, 2009, 21(4): 525-537.
  • 9Elmi A, Solimanpur M, Topaloglu S, Elmi A. A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts. Computers & Industrial Engineering. 2011, 61(1): 171-178.
  • 10Li D N, Wang Y, Xiao G X, Tang J F. Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes. Computers & Operations Research, 2013, 40(5): 1207-1223.

同被引文献25

引证文献6

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部