摘要 移民工作是水电工程的重要组成部分,直接影响到水电工程建设的进行和社会的稳定。以乌东德水电站为例,基于移民安置环境容量的概念,考虑社会、自然、经济、资源4个系统,构建移民安置环境容量评价指标体系,通过衡量影响程度,对评价指标赋予不同的权重,进而对移民规划进行综合评价。结果表明,乌东德水电站的移民安置环境容量总体来说基本上满足要求。 Immigration plays an important role in hydraulic engineering project, which directly affects the process of the hydropower project construction and social stability. Taking Wudongde hydropower station as an example, according to the concept of immigration resettlement environmental capacity, considering four aspects, namely society, nature, e- conomy and resources, environmental capacity evaluation index system of immigration resettlement is established. We en- dow evaluation factors with different weights by measuring their impacts. And the immigration plan is comprehensively evaluated. The results show that the immigration resettlement environmental capacity of Wudongde hydropower station basically meets the requirement.
出处 《水电能源科学》 北大核心 2015年第5期145-147,共3页 Water Resources and Power
基金 国家自然科学基金青年项目(51109165) 教育部博士点基金(20110141120021)
关键词 移民安置 环境容量 综合模糊评价 乌东德水电站 immigration resettlement environmental capacity comprehensive fuzzy evaluation Wudongde hydro- power station
  • 相关文献

参考文献8

二级参考文献30

共引文献26

同被引文献8

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部