期刊文献+

预应力锚索在贵阳大营坡棚户区改造项目中的应用

The Application of Priestesses Anchor Cable in the Redevelopment Project of Squatter Settlement in Dayingpo Region in Guiyang City
下载PDF
导出
摘要 贵阳大营坡棚户区改造项目,拟建F区场地北侧边坡区域高差34.81 m,东侧边坡高差13.21 m。上部采用喷锚支护形式,下部采用超前立柱桩+预应力锚索支护形式。监测结果表明,该形式有效保证了高边坡与周围建筑物的安全。 In the redevelopment project of squat er set lement in Dayingpo region in Guiyang city, builders planned to build F-area of which the altitude difference of northern slope area is of 34.81 m and that of the East is 13.21 m. The upper used sp-raying anchorage supporting form and the lower applied prie-stess’s anchorage cable supporting form and column pile in ad-vance. Monitoring results showed that this form effectively gu-aranteed the safety of the slope and the surrounding buildings.
出处 《城市建筑》 2014年第24期126-126,共1页 Urbanism and Architecture
关键词 高边坡 超前立柱桩 预应力锚索 high slope advanced post priestesses anchor ca-ble
  • 相关文献

参考文献3

  • 1本工程基坑土石方开挖及边坡支护施工图以及地质勘察报告[R].
  • 2本公司技术部门到现场实地踏勘收集的相关资料[Z].
  • 3GB50007-2002.建筑地基基础设计规范[S].[S].北京:中国建筑工业出版社,2002..

共引文献150

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部